Close Menu
GunTacGear
  • Home
  • Latest News
  • Guns and Gear
  • Prepping & Survival
  • Tactical
  • Videos
Trending

Bet365 Bonus Code: Bet $10, Get $365 Ahead of Broncos-Chiefs on Monday Night Football

September 14, 2026

US military must focus on ‘right mix’ of weapons amid stockpile concerns: Official

September 14, 2026

We Knife Co. Grants Elementum a MagnaCut Blade

September 14, 2026
Facebook X (Twitter) Instagram
GunTacGear
Subscribe
X (Twitter)
Login
GTG Trusted Journalism in Firearms News
  • Home
  • Latest News
  • Guns and Gear
  • Prepping & Survival
  • Tactical
  • Videos
GunTacGear
  • Guns and Gear
  • Prepping & Survival
  • Tactical
  • Videos
Home»Tactical
Tactical

Boeing on track for 2028 Air Force One delivery, costs rise

By July 21, 20262 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Boeing on track for 2028 Air Force One delivery, costs rise
Share
Facebook Twitter LinkedIn Pinterest Email

Boeing said on Sunday it remains on track to deliver two new Air Force One jets in 2028, but meeting that target will require additional spending on a program already years behind schedule and billions of dollars over budget.

Boeing was awarded a $3.9 billion contract in 2018 to build the aircraft, though costs have since ballooned to more than $5 billion. The aircraft are intended to replace the current Air Force One planes, which entered service in 1990.

“We’re on track for 2028,” Steve Parker, CEO of Defense, Space & Security, told reporters ahead of the Farnborough Airshow in the UK, adding that he expected the first aircraft to begin testing next year.

“I do expect to see some cost growth there as we come through and we finish off the wiring and the structures, as well as finishing up our own certifications.”

In May 2025, the United States accepted a luxury Boeing 747 from Qatar for use as a temporary presidential aircraft. The jet has since entered service as a bridge aircraft. Security concerns led President Donald Trump to forgo flying the Qatari jet home from Turkey, opting instead to return aboard an older Air Force One.

The Air Force One program involves converting two Boeing 747-8 aircraft into highly specialized jets equipped with advanced communications and defensive systems. Even with a 2028 delivery, the program would be running four years behind schedule.

Read the full article here

Keep Reading

US military must focus on ‘right mix’ of weapons amid stockpile concerns: Official

Geissele Automatics reveals ‘production-ready’ assault rifle for SOCOM

Vengeance and Fury: US Air Force names new CCAs amid ambitious production goal

US Air Force to stand up point defense career field within 2 years, Wilsbach says

China changes law to mobilize all resources in case of conflict. Should neighbors worry?

Drone maker unveils ‘low-cost’ alternative to MQ-9 Reaper

Editors Picks

US military must focus on ‘right mix’ of weapons amid stockpile concerns: Official

September 14, 2026

We Knife Co. Grants Elementum a MagnaCut Blade

September 14, 2026

6 Hunting Rifles Nobody Wants Anymore in 2026!

September 14, 2026

Ella Langley, distractions and Lane Kiffin: Pete Golding calls Ole Miss-LSU ‘high school homecoming’

September 14, 2026

Top Articles

Geissele Automatics reveals ‘production-ready’ assault rifle for SOCOM

September 14, 2026

Alaska moose hunter miraculously survives ambush brown bear attack, says he ‘blacked out’

September 14, 2026

Vengeance and Fury: US Air Force names new CCAs amid ambitious production goal

September 14, 2026
Facebook X (Twitter) TikTok Instagram
© 2026 GunTacGear. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?